Operator training in the ProSight workspace
Use the public workspace to practise three operator tasks with labelled sample data. Each exercise opens the relevant asset and view. You can repeat the exercises without connecting to field equipment.
Read a pump station process view
Open the pump station. Identify the duty pump between the supply tank and discharge line. Compare the discharge pressure with the flow reading and pump feedback. Record which of those three signals tells the operator the pump is running.
Trace a cold-room excursion
Open the cold room trend with the full eight-hour interval. Find the highest sample, record its time and temperature, then select Event log. Compare the loading and recovery events with the curve. Record the observed change and one fact the sample cannot establish about its cause.
Share the same evidence at handover
Open the weather station four-hour trend. Use Link to this view and open the address in another tab. Check that the asset, view and selected interval match. Give the next operator the address, time of interest and measurement unit.
Repeat the exercise on your proposed system
For site training, nominate the shifts and roles that need access and the assets each role should see. Ask the project team to demonstrate the same tasks with a representative point list, agreed units and site timestamps.
.png)
Comments