top of page

Trend history and reporting intervals

40 minutes ago
1 min read

A shift report and a short pressure excursion need different data. Define the measurement interval, transmission interval and report period separately before sizing the project.

Follow the four timestamps

For one sample, record when the instrument measured it, when the gateway received it, when it arrived at the platform and which time the chart uses. Delayed uploads can make an old change appear new if the display uses arrival time.

Choose an aggregation that fits the question

For an hourly temperature report, a mean can describe typical conditions while a maximum helps find an excursion. For energy, compare compatible cumulative meter readings across the period and account for resets. Record the aggregation beside the unit.

Work through a missing interval

If a tank reports every five minutes and misses three updates, a connecting line can hide the gap. Specify whether the operator should see a gap, a stale flag or a delayed backfill. Keep missing values distinct from measured zeroes.

Approve a sample output

Give the reviewer a small reference dataset, its time zone and the expected daily or shift result. Compare one exported or reported interval with the source. Confirm the selected plan’s history, report format and delivery arrangements against that example.

Related resources

Comments


prosight-software-logo (1).png
bottom of page