Energy monitoring for industrial sites
Use a meter trend to see when demand rises and a cumulative energy register to compare consumption over a shift. Treat those as separate measurements when building the site dashboard.
Define the circuits
Start with a feeder schedule. Record the circuit name, meter model, phase arrangement, CT ratio and what each measurement represents. Distinguish whole-site totals from downstream circuits to avoid counting the same load twice.
Map the meter to the gateway
A project using an Acrel ADW210 can be scoped around the specified meter variant and its RS-485 Modbus register map. Confirm the gateway, available register definitions, byte ordering, scaling and update interval before committing to a software configuration.
Build a shift comparison
Compare energy consumed between two timestamps for the same circuit. Investigate missing intervals, meter resets or a changed CT ratio before attributing a difference to operations. Pair the energy figure with the trend of active power when investigating a peak.
Commission the first circuit
Match a displayed register and engineering unit against the meter, then reconcile a known interval against the local total. Agree on the report period, user access, retention and export needs with the ProSight team.